
Renovation Activities ~ As of 1/8/24
January 8, 2024
Renovation Activities ~ As of 2/5/24
February 5, 2024From Ken Ramsay:
- Upper skin is being applied to the Corsair’s left upper wing. Lots of Clecos and rivets (and top photo).
- The inner skin for the H-19’s nose door has been successfully removed from an old door and installed on the newer door (2 photos).
- Ken has installed the floor boards in the J-3 Cub and also the flight controls. Now comes the cabling.
- Bob working on the Cutlass wing tip.
- The aft end of the Cutlass canopy required lots of patching, luckily no one will see it once installed.
- The Cutlass work area.
- Sharon (not my Sharon) is tweaking interior panels she made for the Beech. She is using Bruce’s machine.
- Two panels have been installed in the Beech, WOW.