Renovation Activities ~ As of 1/8/24January 8, 2024Renovation Activities ~ As of 2/5/24February 5, 2024 From Ken Ramsay: Upper skin is being applied to the Corsair’s left upper wing. Lots of Clecos and rivets (and top photo). The inner skin for the H-19’s nose door has been successfully removed from an old door and installed on the newer door (2 photos). Ken has installed the floor boards in the J-3 Cub and also the flight controls. Now comes the cabling. Bob working on the Cutlass wing tip. The aft end of the Cutlass canopy required lots of patching, luckily no one will see it once installed. The Cutlass work area. Sharon (not my Sharon) is tweaking interior panels she made for the Beech. She is using Bruce’s machine. Two panels have been installed in the Beech, WOW. Share