Renovation Activities ~ As of 1/26/23
January 26, 2023
Renovation Activities ~ As of 2/3/2023
February 3, 2023- More work on the H-19. Jodie and crew installed the remaining two rotor blades (3 photos).
- And the tail rotor mechanism fabricated at MAPS is being replaced with a real one.
- John and Dan are working on the Cutlass left wing skin. Getting the old skin off is a real chore (photo above also).
- Jerry rescued the left wing position light fixture, so a mounting hole was made to install the fixture.
- Jerry has done a great job of removing the damaged material from the left wing’s leading edge. Let the reskinning begin.