Renovation Activities ~ As of 12/6/23December 6, 2023Happy New Year 2024 !!December 31, 2023 From Ken Ramsay: Work continues on the J-3 Cub’s wing. Lots of fairly fragile parts. New lettering on the Cassutt. More parts being installed on the Corsair’s right inner wing assembly. Rotating beacon being installed on the H-19’s upper cover (top photo too). Yes, it works. Final panel being glued and screwed to the Cutlass left outer wing. And the left outer wing with all of the skin installed. Now comes the wing tip. Evelyn cleaning the cutlass ejection seat. Left and right side panels being fitted to the Cutlass canopy (2 photos) The entrance lobby is all set for Christmas. Quiz question: What is Reed doing? Share