Happy New Year 2025!December 31, 2024 From Ken Ramsay: Patch going on the left side of the Cutlass intake. Started to work on disassembling the Cutlass windscreen. The screws are thoroughly rusted in place. Jerry found and installed a work light for the Cutlass table. The nose cone has been installed on the V-1. And the V-1 has been primed. Corsair flaps continue to be fabricated. Serious work has been started on the F-104. The hanger has been filled for the winter (3 photos, plus top photo). Speaking of winter, we have snow. Share