Renovation Activities ~ As of 9/5/25
September 5, 2025
Renovation Activities ~ As of 10/5/25
October 5, 2025From Ken Ramsay:
- Painting continues on the J-3 Cub.
- The horizontal stab for the F-104 is coming along. Top side has been skinned.
- And the rear canopy fits and the hinge mechanism works.
- Bob is repairing the aft end of the Cutlass.
- And Paul is installing the big fuselage panel (lots of threaded holes).
- Carl and John are in the process of cleaning and painting the T-33 (2 photos).
- The Corsair’s outer wing structure requires lots of holes.
- Bill installed the Corsair’s left gear linkage without too much trouble.
- The right gear linkage was another story.
- Jerry Leeks bought another truck and put the MAPS logo on it. Thank you Jerry (top photo also).
- Air Force flight line.
- Navy/MiG flight line.