Annual Cash-Raffle Fundraiser
February 6, 2026
Renovation Activities ~ As of 2/25/26
February 25, 2026From Ken Ramsay:
- We received the Cutlass nose wheels all mounted and foamed from the tire man. Bob assembled the bearings and seals, touched up the paint and set them aside to dry.
- And then on Wednesday the wheels were installed on the gear. I am told that they just slipped on with no problem.
- And then the nose was lowered to facilitate installing the side windscreens (2 photos).
- Jerry working on the O-2’s nose gear.
- And a side nose panel has been fabricated for the O-2.