February 6, 2022From Ken Ramsay:
A tradition resumes. Last Saturday, after the membership meeting, we had hot dogs, beans and birthday cake (with fellow Members/Volunteers). Seemed like old times.
- In addition, the new bar was dedicated. Champaign was served and much toasting occurred.
- The Corsair’s aft fuselage is turning blue thanks to Bill (and photo on top).
- We installed the Sabre’s nose cover to see how it fit. Will need a little tweaking for a tight fit.
- Dan installed the center armament panel in the cockpit.
- And the right cockpit side panel is filling up. Radio panels are installed and the light panel is being fabricated.
- We have received the main structural pieces for the Corsair’s wing attachment to the fuselage. Dave provided the drawings for their fabrication. There is more work to be done and some welding before the structure can be installed.