Renovation Activities ~ As of 11/22/24
November 22, 2024From Ken Ramsay:
- Stitching the fabric on the J-3 Cub’s wing is a very tedious process.
- Position light socket installed in the cutlass right wing underside.
- Rebuilt nose wheel on the F-104 installed and seems to hold air. Only time will tell.
- The hoist has been installed on the H-19.
- Corsair flap ribs have been cut. Shaping is next.
- And Dave has made a form for the flap assembly.
- Skinning the J-3 Cub’s wings continues.
- And skinning of the Cub’s fuselage has begun.
- The nose of the cutlass has been removed for restoration.
- Paul; has been working on the Cutlass vertical tail while the weather is good.
- Applying glue on the sheet PVC for a panel on the Cutlass right outer wing.
- Screwing the aluminum and PVC panel to the wing structure.
- Weights to hold everything together while the glue sets.