March 7, 2023Renovation Activities ~ As of 3/23/23
March 23, 2023From Ken Ramsay:
- Suddenly the F-105 has primer on its aft end.
- Ron & Jodie continue to fabricate the tail cap on the H-19. A combination of foam, duct tape, epoxy and body putty
- Our C-130 is getting its tires changed. The Army Guard is taking care of it.
- Jodie doing some welding on the HOPTO.
- We’re trying a different reskinning proposal for the Cutlass. Apply a 3/8 thick piece of PVC to the opening. Then glue (construction adhesive) a layer of aluminum to the PVC, then screw the aluminum to the framework. This photo shows the opening.
- PVC covering the opening.
- And the aluminum sized but not yet attached (we didn’t have any PVC compatible construction adhesive).
- Bob continues to work on fabricating a new wingtip for the Cutlass.
- Dan is making the tip transition piece for the ailavator (2 photos).