
Renovation Activities ~ As of 6/11/23
June 11, 2023
Renovation Activities ~ As of 6/26/23
June 26, 2023From Ken Ramsay:
- The F-86A continues to look great.
- The Corsair’s inner wing skin requires a lot of holes and countersinks (photo above also).
- Bob & Jerry working on the Cutlass wing tip. It is over 4 feet long and a compound curve.
- The PVC sheet being fitted for the last skin panel on the bottom of the Cutlass left wing.
- Aluminum wing panel glued to the PVC sheet.
- The last panel installed on the wing’s underside.
- The underside of the wing primed. Now to turn the wing over.