Renovation Activities ~ As of 6/5/22June 5, 2022Happy 4th of July & Stay Safe!July 3, 2022 From Ken Ramsay: During aircraft movement we had a little booboo. The rudder of the OV-1 touched the wingtip of the A-26 (3 photos). Ron has begun the welding of the Corsair’s right forward wing spar (2 photos). And fabrication of the Corsair’s right aft wing spar has begun. The F-105’s aileron restoration is coming along (right in photo) and the new aileron is being skinned (left in photo). The rotor gearbox for the H-19 was installed (and top photo). It is low enough that it will not impede getting the copter out of the door. We have completed the fabrication of the F-86A’s belly panel. It is ready for Kathy Jo to prime it. Quiz time. Identify each of the 4 aircraft. Answer at the end. F-101, F-100, F-14, A-7 Share