
MAPS Air Museum in the News – Vintage Aviation News
May 28, 2024
MAPS Air Museum Closed for Electrical Work
June 13, 2024From Ken Ramsay:
- Dan has made and installed the leading edge on the J-3 Cub’s left wing.
- Dave is assembling the wing fold mechanism for the Corsair.
- And the first part of the wing fold hinge has been installed on the left inner wing. Went on screaming and kicking, right Bill?
- Dennis is forming the Corsair’s leading edge ribs. A big thank you to the Bowdil Company for annealing the rib pieces for us.
- Gary is getting new axels made for the Corsair’s landing gear.
- Paul continues to work on the F-105’s centerline pylon.
- And the pylon is coming along.
- The left and right wing pylons have been installed on the F-105 (top photo also).
- Bob and Mike continue to work on the Cutlass right wing tip.
- I cut out the PVC piece for one of the Cutlass wing doors, aluminum is next then assembly.
- The F-84 has a new weapons system installed.