Renovation Activities ~ As of 6/26/23June 26, 2023Renovation Activities ~ As of 7/23/23July 23, 2023 From Ken Ramsay: Dan is working on door panels for the truck’s back door. Jim is working on the visitor platform for the A-4 simulator. The Cutlass has been lowered to better facilitate working on it. With better working conditions, Jodie and the team removed the right. Yes, it came off screaming and kicking (3 photos). The Cutlass right ailavator had some tip damage. But, repairs are in the works. Chris is cleaning out the critter debris inside the ailavator. Jerry has another leading edge to repair. And work has started to remove the left wing. Evelyn continues to clean the Cutlass ejection seat. And the engine for the J3 Cub looks ready to go. The Corsair’s right wing structure has been attached to the fuselage (also top photos). Share