![](https://mapsairmuseum.org/wp-content/uploads/2021/09/T-34-a.jpeg)
Renovation Activities ~ As of 9/13/21
September 13, 2021![](https://mapsairmuseum.org/wp-content/uploads/2021/10/OV-1.jpeg)
Renovation Activities ~ As of 10/3/21
October 3, 2021From Ken Ramsay
- Door panels on the F105 that are severely corroded are being replaced (photo above also)..
- Here is a view of the back side of the bar with all of its interior details. It won’t be long now.
- Smooth patches are being completed on the F-105 to blend in with the fuselage skin.
- The wings tips are down on the F-4 to facilitate its restoration.
- Dan finished applying the stars on the rudder and I built the base support structure for the F-100 vertical stabilizer for the F-100 Museum.
- And Ken (not me) continues to repair the left wing attach structure.