Started off the new year assembling cabinets for the Super Sabre Memorial Exhibit (SSME) and other upstairs displays. The SSME is getting a little crowded (Photo above also).
Unpacking the cabinets has resulted in our cardboard mountain.
Paul is fabricating probably the largest patch we have ever installed on an aircraft (2 photos).
This is Dave’s photo of the Corsair. Much better perspective than mine.
The T/A-37’s wings are being fitted for fuel tanks and pylons.
Dennis & Bill are installing fairings where the horizontal stab meets the aft fuselage.
And Dave continues to work on the second Corsair elevator.
Al did a marvelous job of lettering a very small instruction panel for the F-86A.