Trial fit of the first skin panel on the Cutlass left outer wing. The PVC backing has been glued to the underside of the aluminum and the completed panel will be installed on Saturday.
Work continues on the Corsair’s Wing root (3 photos).
Interior paneling is being installed in the H-19 (top photo also)