Renovation Activities ~ As of 11/6/24November 6, 2024 From Ken Ramsay: The Cutlass is in the building (top photo also) Front end. Left Bay. Windscreen needs some work. As does the instrument panel. However, Jerry is coming along on repairing one of the slats. Corsair inner flap pieces being fabricated. Assembly jig for the inner flap. Wings for the V-1 Buzz Bomb are laid out. V-1 wing being assembled. Share