Renovation Activities ~ As of 10/3/23October 3, 2023Veterans Day 2023November 11, 2023 From Ken Ramsay: The F-105’s vertical stabilizer has been installed. I’m told it went on screaming and kicking (3 photos plus top photo). Our little garden still looks nice clear into October. And the plantings along the hanger still look nice. Last week, Paul power washed the F-84F. The first piece of aluminum skin is being fitted to the upper surface of the left outer wing for the Cutlass (3 photos). Bob and Dan working on the Cutlass’s left wing tip. We had three senior students from Stow High School helping us. Christian, Emilia, Connor. Covers are being made by John for the PT-19’s wooden propeller to protect it when outside. One side is finished. Our Sabre family is now together. The Corsair’s right inner wing skin is being fitted. Share