Renovation Activities ~ As of 10/3/23
October 3, 2023
Veterans Day 2023
November 11, 2023From Ken Ramsay:
- The F-105’s vertical stabilizer has been installed. I’m told it went on screaming and kicking (3 photos plus top photo).
- Our little garden still looks nice clear into October.
- And the plantings along the hanger still look nice.
- Last week, Paul power washed the F-84F.
- The first piece of aluminum skin is being fitted to the upper surface of the left outer wing for the Cutlass (3 photos).
- Bob and Dan working on the Cutlass’s left wing tip.
- We had three senior students from Stow High School helping us. Christian, Emilia, Connor.
- Covers are being made by John for the PT-19’s wooden propeller to protect it when outside. One side is finished.
- Our Sabre family is now together.
- The Corsair’s right inner wing skin is being fitted.