![](https://mapsairmuseum.org/wp-content/uploads/2021/11/20211109_122326-scaled.jpg)
Renovation Activities ~ As of 4/24/24
April 24, 2024![](https://mapsairmuseum.org/wp-content/uploads/2024/05/IMG_7274-150x150.jpg)
Renovation Activities ~ As of 5/5/24
May 5, 2024From Ken Ramsay:
- The F-105’s centerline pylon is taking shape.
- Ted is doing a little welding on the centerline pylon framework.
- The F-105’s nose tire is holding air. Good work Jerry.
- The newly painted A-7 is out on display. Some minor touch-ups and she is finished.
- I don’t just take photos, I actually do some work. Applying adhesive to the last panel on the upper side of the Cutlass right outer wing.
- And the aluminum is in place and will cure for a few days.
- The Cutlass canopy actuator is hydraulic. We will replace it with an electric one.
- Jim has new wheels, an electric bike. Needs some nose art.