Renovation Activities ~ As of August 15, 2022
August 15, 2022Normal Visiting Hours during the NEO Coffee & Cars Show
August 25, 2022From Ken Ramsay:
- The rocket noses in the M-61 rocket pod on the Cobra started to disintegrate.
- So, using Jim Boyea’s suggestion I made new ones using fence post top cones.
- Installed on the right side with lots of help from Dan. Left side noses are in process.
- Mary and Bill continue to paint the hanger. Looks great.
- The T-28 is getting new nose paint. We have found that orange and red paint don’t weather well.
- Here is the Cutlass taken by Rick from the top of the F-105. Needs a little work.
- Hole on top of the F-105’s right wing above the gear well.
- Patch installed. It is reinforced so it can be walked on.
- Overall view of the right wing.
- We removed the Sabre’s right wing from the vertical cart and placed it flat on top of the left wing.
- And then we tried to install the right flap. It wouldn’t install although we had trial fit the rails before attached them to the wing.
- Lying down on the job attaching the flap locking mechanism (Kathy Jo photo)
- The right flap is on.
- The H-19’s engine has been put in place after extensive work on cooling shrouds and exhaust manifold.
- The Corsair’s right main wing spar is complete. Left spar is in work.
- Part of the Corsair’s landing gear attachment fittings are in work made of steel.
- Ray is assembling trim tabs for the Corsair.
- And Tom is working on the elevator actuation mechanism. Yes, the elevators and rudder will work when completed.