Renovation Activities ~ As of 8/8/22
August 8, 2022
Renovation Activities ~ As of 8/21/22
August 21, 2022From Ken Ramsay:
- Lots of drilling on the Corsair’s wing supports.
- Final assembly of the Corsair’s right wing support (2 photos)..
- Upper wing skin repairs must be made to support people walking on the wing.
- Bob making a replacement panel for the Sabre.
- The flap and aileron have been installed on the left wing. Yeah, they went on screaming and kicking and required installing bolts and nuts in some very tight spaces. (3 photos plus the photo on top)
- Dan installed the last instrument on the F-86A’s instrument panel. The panel is now complete. The instrument was made on Al’s 3D printer.
- Primer applied to the H-19’s cooling shrouds.
- And you thought our helicopter was in bad shape.